Mt. Carlton Project

  • Full production drilling from 102mm to 127mm hole diameters
  • 2 x DPi 1500 Drill Rigs are continuing to meet targets
  • 1 x L8 RC Drill Rig is completing the RC grade control campaigns
  • Cardross Mining using their own MMU for pumping of ANE down the hole

Cardross Mining has successfully completed the RC program and has just begun another acheter viagra 8 week campaign.

<< Back