MCG Group January 2010 – Present
MacArthur Coal - Middlemount Project
- Retaining wall stabilisation
- Installation of soil nails and grouting
- Testing of soil nails
- Shotcreting of retaining wall to Main Roads specifications
M & G Crushing & Materials December 2009 – Present
Gingerella Pit
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes to specific rock diameter
KDD Construction & Mobile Crushing November 2009 – Present
Don's & Clark's Pit
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes to specific rock diameter
WATPAC Civil & Mine September 2009 – Present
Kennedy Development Highway Project
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes to specific rock diameter
Ostwald Bros September 2009 – Present
Kennedy Development Highway Project
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes to specific rock diameter
Mackay Regional Council Marck 2009 – Present
MRC Quarry Projects
- Drilling of 10 active quarries in Mackay Regional Council area
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes to specific rock diameter
- Assist in establishment of all safety management plans throughout the quarries
Mirriwinni Lime June 2008 – Present
Various Quarry Projects
- Drilling of active quarries in Christmas Creek, Mt Garnet, Mt Carbind and Mt Moss
- Design of blast patterns and blast tie-ups
- Mark out of blast patterns
- Loading and Blasting of drilled holes specific rock diameter
- Exploration drilling
Kagara Zinc Pty Ltd June 2007 – December 2009
Balcooma Project (July 2007 – December 2009)
- Production drilling and blasting of waste rock and ore
- Wall support drilling, cabling and tensioning
- De-watering holes
- Pre-splitt drilling of pit walls
Balcooma Project (2005 – July 2007)
- Construction and maintenance of 5km all weather haul road and river crossing
- Provision of a workshop, diesel and oil storage facilities
- Clearing of vegetation, topsoil stripping and stockpiling
- Construction of sediment dams
- Drilling and blasting of waste rock and ore
- Cable bolting of unstable walls
- De-watering holes
- Presplitting of pit walls
- Stripping and placement of PAF and NAF waste rock
- Capping of PAF waste rock
- Haulage of ore to Surveyor hard stand
Surveyor Project (2003 – 2005)
- Construction and maintenance of 5km all weather haul road and river crossings
- Extension of airstrip to exceed Flying Doctor requirements
- Provision of camp and catering facilities
- Provision of a workshop, diesel and oil storage facilities
- Clearing of vegetation, topsoil stripping and stockpiling
- Construction of sediment dams and water dams
- Drilling and blasting of waste rock and ore
- Cable bolting of unstable walls
- De-watering holes
- Presplitting of pit walls
- Stripping and placement of PAF and NAF waste rock
- Capping of PAF waste rock
- Haulage of ore to Mt Garnet
- Backfilling of Surveyor Pit
Mt Garnet Project (2002 – 2008)
- Clearing of vegetation, topsoil stripping and stockpiling
- Construction of access road
- Undertake earthworks to allow the construction of office facilitation, crushing and flotation plant, workshop and storage areas
- Construction of sedimentations dams, water dam and tailings storage facility
- Drilling and blasting of waste rock and ore
- Cable bolting of unstable walls
- De-watering holes
- Presplitting of pit walls
- Stripping and placement of PAF and NAF waste rock
- Capping of PAF waste rock
- Haulage of ore from the pit to ROM stockpile
- Transfer of ore material from ROM to crushing plant